About the Fermilab Dynamic Display System

Installations

Presently (Winter 2020), Dynamic Displays are installed in the following locations:
  • ROC-West (12 displays) *
  • ROC-East (10) *
  • Site 38/FESS Ops (6)
  • MINOS (5) *
  • AD Computer Room (2)
  • Linac North End (2)
  • WH12E/Neutrino Division (2)
  • WH2E (2)
  • WH8W/PPD (1)
  • Fermilab Test Beam Facility (FTBF) (1)
  • WH10/ND (1)
  • WH11/LPC (1)

* – These locations have dedicated, touch-screen PCs for controlling the content on their displays.

Next - More documentation on the Dynamic Display system